The Campus Stormwater Wetland Retrofit Project, with funding from the NC DEQ 319 Program, involved converting a dry-detention basin to a stormwater wetland. Dr. Charles Humphrey served as the Principal Investigator (PI). Co-PIs of…
The Campus Stormwater Wetland Retrofit Project, with funding from the NC DEQ 319 Program, involved converting a dry-detention basin to a stormwater wetland. Dr. Charles Humphrey served as the Principal Investigator (PI). Co-PIs of…