2019 Spring – Christenbury Gym – Design Development

Student teams have completed furniture and reflected ceiling plans for the adaptive reuse of Christenbury Gymnasium.  They have also created a preliminary, per-square-foot budget, and identified some of the major design challenges they faced.  And they have produced renderings in Revit, as well as identifying furniture and finishes.         31NONE-P3          … Read more

2018 Spring – Co-Working in Durham NC – Design Development 2

With this portfolio, the students completed their design of the co-working project, with renderings, furniture and finish selections, seating specs, and a line item construction budget.       Method-4a                 Fusion-4                 Triverge-4        Divergent-4                Skyline-4   … Read more